WTCCC CHURCH

PROJECT BLOG

PROJECT INFORMATION

  • PROJECT TYPE: Church

  • LOCATION: Mississauga, ON.

  • AREA: 10322.75 ft2

  • YEAR: 2018 - 2019

  • LEAD ARCHITECT: Jason Chiu

  • DESIGN TEAM: Jason Chiu, Matthew Wong, Areche Yeung

  • MECH/ELEC/PLUMB. ENGINEERING: Michael Ifejika and Daniel Boragina (Quasar Consulting)

  • GENERAL CONTRACTING TEAM: Rob Santucci, Telmo Nunes and Andrea Castillo (Bulid it By Design)

 

CONSTRUCTION ADMINISTRATION SITE PHOTOS

EXISTING WAREHOUSE CONDITIONS

WEEK 4-5 CONSTRUCTION

WEEK 11-12 CONSTRUCTION

SUBSTANTIAL PERFORMANCE PROJECT COMPLETED

MATERIAL SELECTION SAMPLE BOARD

ARCHITECTURAL DRAWINGS

GROUND FLOOR PLAN

REFLECTED CEILING PLAN

BUILDING ELEVATION

RECEPTION DESK DETAIL

INFORMATION COLUMN DETAIL

SANCTUARY CROSS ELEVATION + DETAIL

SANCTUARY INSULATED WALL PANEL LAYOUT

MAIN CORRIDOR WALL DETAIL FOR RECESSED TV DISPLAYS